The Bourg-en-Bresse Decathlon project was finished in 2021 and is located in the city center. The project required a seamless integration to the design and environment, following BREEAM standard requirements. 

The Bourg-en-Bresse Decathlon project was finished in 2021 and is located in the city center. The project required a seamless integration to the design and environment, following BREEAM standard requirements. 

Text: The new building, is a complete success: Water retention tank, vegetated green roof systems, photovoltaic panels – all these systems enable the building to be energy self-sufficient, while skylights and windows let natural light in to avoid an excessive use of the air conditioning system. The natural light is provided through Bluesteel Therm NSHEV systems:  

  • 15 Bluesteel Therm Pneu (140X140 et 150X150), 

  • 1 Bluesteel Therm Treuil (100X100), 

  • 1 Bluesteel Therm Pass (120X120), 

  • 3 Bluesteel Therm Fix (200X300). 

Harmonie blades on the façade 

The façade of the building has been aesthetically enhanced with the addition of Harmonie Façade blades 30X50. Horizontal and smooth, installed at the forecourt’s entrances, under the cladding and strips, they give the building some more aesthetics. 

  • Contracting manager: Decathlon / Bourg-en-Bresse (FR-01) 

  • Project Manager (Engineering): Climatair Rhône (and Médiosphère) / Lyon area (FR-69)